top of page

JESÚS DANIEL PIÑEYRO RIBERO
CIVIL ENGINEER | PMP® | ROAD INFRASTRUCTURE | PROJECT MANAGER | BIM & CIVIL 3D
Reconstruction of Route N°4 between Baygorria town and Route N°20
Widening and strengthening works using basaltic material (granulometrically stabilized) along 20 km. Execution of double bituminous surface treatment as wearing course over a 20 km section.
Position: Site Manager at Meliter S.A.
Client: Ministry of Transport and Public Works






















bottom of page