top of page

Reconstruction of Former Route N°4 

Road widening, pothole repair, granular material overlay, and stabilization with Portland cement. The paving works consisted of the construction of a double bituminous surface treatment. Horizontal and vertical road signage were also included.


Role undertaken: Preparation of the Detailed Design (Executive Project) and Project Director on behalf of the Durazno State Government.

Contractor: Lubinfox S.A. (Durvial)

IMG_20230131_094446.jpg
IMG_20221130_093555.jpg
IMG_20221208_103031.jpg
IMG_20221209_105044.jpg
IMG_20230831_115616.jpg
WhatsApp Image 2026-03-24 at 12.13.07 PM (1).jpeg
WhatsApp Image 2026-03-24 at 12.13.02 PM (3).jpeg
IMG_20230927_165110.jpg
IMG_20230215_091825.jpg
IMG_20221130_110618.jpg
IMG_20230301_094526.jpg
IMG_20221208_104254.jpg
WhatsApp Image 2026-03-24 at 12.13.06 PM.jpeg
WhatsApp Image 2026-03-24 at 12.13.02 PM (1).jpeg
IMG_20230927_165556.jpg

Contact me

Cel phone :(+598) 091383814

E-mail: ing.jpr@gmail.com

  • LinkedIn Long Shadow

© 2019 by Eng. Jesús Daniel Piñeyro Ribero

¡Tus datos se enviaron con éxito!

bottom of page